Project Description
A fully integrated two level above grade Metrolinx bus terminal (relocated from 141 Bay St.) is included in the development. Connections to TTC, GO Transit, VIA Rail and the Toronto “PATH” are all part of the scope of work, as well as links to adjacent Bay Street East Teamway, West Terrace Overbuild and the adjacent Air Canada Centre.
Close coordination with a multi-disciplinary team and Metrolinx stakeholders and their latest Design Requirements Manual was required, during which Mulvey & Banani became very familiar with the Electrical, ICT, Security and Audio Visual requirements for the station.