Lester B. Pearson International Airport, New Terminal 1

General Info

About the Project

Project Description

The T1, 77 gate redevelopment project was implemented over 15 years, eventually replacing existing Terminals 1 and 2. The project began in 1999 and at the time was described as Canada’s largest construction project. A significant feature of this project is the high degree of flexibility designed into the systems. The “spine” of the electrical distribution system is set up as a series of nodes in a continuous service band. Cabling design was part of the facility’s structured cabling system. A complete security system consisting of CCTV surveillance, access control and monitoring was implemented, with more than 700 cameras, and digital recording systems, all monitored and controlled off site. MBII’s scope of involvement included complete design, specification contract administration and commissioning of the entire system. AWARD: Best Global Airport 2006- The Institute of Transport In joint venture with Ove Arup.

Scope

Electrical Engineering

ICT Engineering

Security Engineering

Final Budget

$1.7BN

Primary Sector

Transportation

Secondary Sector

Aviation

Client

Greater Toronto Airports Authority

Architect

IDS Group Inc. Airport Architect Canada Adamson Associates Architects Moshe Safdie Architect

Project Team

In conjunction with Arup

Staff Members

Nick Manesis

Project
Assiniboine Park Leaf Conservatory
Winnipeg, Manitoba Learn More
Project
FirstOntario Performing Arts Centre
St. Catherines, Ontario Learn More
Project
Women's College Hospital Redevelopment
Toronto, Ontario Learn More